)
I have received notification see below of the re routing on a temporary basis of the 997 bus service and also the 28. This is due to continued resurfacing work by Amey (the private contractor given the contract to upgrade our roads by the previous Council administration.)
I am continuing to press Amey to get on and finish the resurfacing work on the Aldridge Road asap the length of time being taken to complete this resurfacing is not good enough.
OPERATIONAL ORDER
Aldridge
Road Phase 6
From Monday 12th
May 2014 to Friday 16th
May 2014, 20:00-06:00.
Aldridge Road from Greenholm Road to Beeches
Road and Beeches Road to Dyas Road will be closed for Resurfacing
works to be carried out
Junctions at Greenholm Road. Beeches Road and Dyas Road will be
open
Diversion
Service 997 from Birmingham
Aldridge Road, right Greenholm Road, left Kingstanding Road, left
Dyas Road, right Old Oscott Lane to join normal line of route.
Service 997 to Birmingham
Reverse
of above
Service 28 to Great Barr if required.
Dyas
Road, right Aldridge Road, left Malthouse Lane, left Beeches Road, right Hassop
Road to normal line of route
Service 28 from Great Barr if required.
Reverse of
Above.
No comments:
Post a Comment